Driveway:
Thursday, December 19, 2013
Wednesday, December 4, 2013
Thursday, November 14, 2013
石灰华地板和预制件窗台
Precast Fireplace before grout. Travertine floor. 洞石,学名叫做石灰华(Travertine),是一种多孔的岩石,所以通常人们也叫它洞石。洞石属于陆相沉积岩,它是一种碳酸钙的沉积物。洞石大多形成于富含碳酸钙的石灰石地形,是由溶于水中的钙碳酸钙及其他矿物沉积于河床、湖底等地而形成的。由于在重堆积的过程中有时会出现孔隙,同时由于其自身的主要成分又是碳酸钙,自身就很容易被水溶解腐蚀,所以这些堆积物中会出现许多天然的无规则的孔洞。由于天然洞石的独特的形成过程,所以在划分上也有些混乱,有的把它划到大理石,因为它是有石灰石形成的,而有的却还是把它当成是石灰石,毕竟他没有经过变质过程。
Master Bath -- Travertine floor and Granite tub wrap.
Precast window sills and entrance installed.
Wednesday, October 30, 2013
Stucco completed and starting floor Tile
Stucco is completed and Scaffold is removed.
Before Travertine floor installation, orange plastic mat is installed for expansion and shifting control to prevent tile cracking.
Monday, October 28, 2013
Friday, October 18, 2013
Interior Paint, Cabinet Stain and Exterior Color Coat
Wall, Ceiling, Door, Crown Molding Painted. Color Navajo White for wall and ceiling. Color Swiss Coffee for door and trim.
Cabinet stained without highlight. Waiting for Granite.
Stucco color coat with Spanish Sand color Pigment.
Monday, September 23, 2013
Thursday, September 12, 2013
Cabinet and Garage Door
Kitchen island table(5' x 9 1/2') before stain and granite top.
Wine Cellar rack before stain and granite top.
Garage door before painting.
Monday, September 9, 2013
Thursday, September 5, 2013
Drywall completed
Drywall completed with imperfect smooth texture finish. Ready for painting and cabinet.
Imperfect smooth texture.
Finished and sanded wall.
Cabinet installation started today.
Imperfect smooth texture.
Finished and sanded wall.
Cabinet installation started today.
Sunday, August 25, 2013
Thursday, August 22, 2013
Wednesday, August 7, 2013
Crown Moldings, Baseboard and Door Casing selections
Crown Molding:
http://www.kelleher.com/product/4/region/N/item/6477
Baseboard:
http://www.kelleher.com/product/4/region/N/item/6481
Door Casing:
http://www.kelleher.com/product/4/region/N/item/6480
Interior Passage Door:
http://www.craftmasterdoors.com/pageBuild.asp?PageID=C_cremona_ps
Solid core and smooth surface.
http://www.kelleher.com/product/4/region/N/item/6477
Baseboard:
http://www.kelleher.com/product/4/region/N/item/6481
Door Casing:
http://www.kelleher.com/product/4/region/N/item/6480
Interior Passage Door:
http://www.craftmasterdoors.com/pageBuild.asp?PageID=C_cremona_ps
Solid core and smooth surface.
Thursday, August 1, 2013
Thursday, July 25, 2013
Saturday, July 13, 2013
Windows
Windows and external doors are installed this week.
Waterproof sheet and sealed before window is installed.
Triple-pane Low-E 366, High Performance Max(HPMAX) glass. Triple-pane with two lites of Low-E and one lite of Interior Surface Low-E and two chambers of Argon gas fill.
U-factor: 0.24
SHGC: 0.25
VT: 0.42
Waterproof sheet and sealed before window is installed.
Triple-pane Low-E 366, High Performance Max(HPMAX) glass. Triple-pane with two lites of Low-E and one lite of Interior Surface Low-E and two chambers of Argon gas fill.
U-factor: 0.24
SHGC: 0.25
VT: 0.42
Tuesday, July 9, 2013
Wednesday, June 26, 2013
Roof and Deck
Roof covered with Tar Paper
Deck to left side.
Deck to left side.
Deck to the right side towards the city. Sunny day after unusual rain yesterday.
Wednesday, June 19, 2013
Thursday, June 13, 2013
Subscribe to:
Posts (Atom)