Wednesday, October 30, 2013

Stucco completed and starting floor Tile


Stucco is completed and Scaffold is removed.


Before Travertine floor installation, orange plastic mat is installed for expansion and shifting control to prevent tile cracking.

Monday, October 28, 2013

外墙和大理石



Master Bath Tub 大理石。


Island table 大理石。


外墙Color Coat 结束,还有Precast 窗台没有装。

Friday, October 18, 2013

Interior Paint, Cabinet Stain and Exterior Color Coat


Wall, Ceiling, Door, Crown Molding Painted. Color Navajo White for wall and ceiling. Color Swiss Coffee for door and trim. 


Cabinet stained without highlight. Waiting for Granite.


Stucco color coat with Spanish Sand color Pigment.