Thursday, August 1, 2013

Stucco Lath started

Stucco Lath:


Stucco on the deck.


Stucco drop in the front.


Front lath started from bottom.

Thursday, July 25, 2013

Saturday, July 13, 2013

Windows

Windows and external doors are installed this week.


Waterproof sheet and sealed before window is installed.


Triple-pane Low-E 366, High Performance Max(HPMAX) glass. Triple-pane with two lites of Low-E and one lite of Interior Surface Low-E and two chambers of Argon gas fill.

U-factor: 0.24
SHGC: 0.25
VT: 0.42